|
3 windows have been installed on the front of the addition. 2 are in the bedroom and 1 is in the closet. |
Link to see the previous phases of construction:
The Addition
Here it is! The new hallway from our family room into the addition. The covered deck is on the right of the hallway, the new bedroom is on the left, and a bathroom is at the end of the hall.
|
Close up view of the sliding glass doors. |
|
Construction is still underway on the covered deck, but you can see the frame of the fireplace along the back wall |
|
View from the opposite side of the covered deck |
|
the new bedroom |
No comments:
Post a Comment